Standards & Contracts

Front End Construction Contract Documents


Consultants are instructed to use the most current version of the Front End Construction Contract Documents Templates when designing a project. The following instructions have been provided on how to fill out the templates along with submittal requirements for delivery of bidding documents:

 
Memo - Updated Front End Contract Documents 6-22-2016
Instructions - Front End Construction Documents Templates 3-31-2016
Consultant Instructions Submittal Requirements Rev 04-01-2016
Front End Construction Contract Documents Division 00
Front End Construction Contract Documents Division 01


City Plan Preparation Standards (CPPS)


The City of Corpus Christi Engineering Services Department issued the original Plan Preparation Standards and Contract Format document on January 30, 2001. The purpose of this document was to establish, define and clarify the requirements for preparing all project drawings for the City of Corpus Christi, including private developer plans, as applicable. Addendum No. 1 was issued on June 23, 2005, and Addendum No. 2 was released on July 12, 2007. Some references and terms are dated since 2007 (to be addressed in future updates), but essential elements are still applicable. Please check with the City Project Manager for any questions. 

City Plan Preparation Standards: Combined 2001 with 2005 Add. #1 and 2007 Add. #2

2001 Original Issue
2005 Addendum No. 1
2007 Addendum No. 2
CPPS 2001 - Section 1-8 - w 2005 updates
CPPS 2001 - Section 3.0 A - Regarding use of City Standards
CPPS 2001 - Section 6 - Submittals - w 2005 updates
CPPS 2001 Exhibit 3 City Key Detail, North Arrow
CPPS 2001 Exhibits 11 and 12 Project and Drawing Review Submittal Checklists
CPPS 2005 Add 1 Att 9 Exhibit 13b Guidelines for Street Plans
CPPS 2005 Add 1 Att 9 Exhibit 13e Elements of a Design Memorandum

All A/E consultant submittals of construction bid documents (such as Engineering Letter Reports, 60% Designs, 90% Designs, bid documents, etc.) to Engineering Services must be accompanied by the completed Design Submittal Checklist which is available below:
Design Submittal Checklist Memo 1-15-2014
Design Submittal Checklist 02-08-2017


Project Submittal Checklist (Rev. 6-3-2016)
Drawing Review Checklist (Rev. 6-3-2016)